200 - 100 Park Royal, West Vancouver, BC V7T 1A2

Essential Commercial Kitchen Services

Bill TO:

Dummy Company
c/o: Alex Collins test
200-100 Park Royal S
West Vancouver, Select a State... V7T 1A2

Invoice: 58115
Date: 2023-08-21
Due Date:
Terms:
Service Report:  
PO:
REP: AC

Products / Services

<p>Qty.</p> <p>Cost</p> <p>SKU</p> <p>Item</p> <p>Serviced</p> <p>Discount</p> <p>Total</p>
<p>1</p> <p>$600.00</p> <p>1005001</p> <p>Commercial Exhaust Hood Maintenance and Cleaning</p> <p>$600.00</p>
<p>1</p> <p>$50.00</p> <p>1005022</p> <p>Truck / Fuel Surcharge</p> <p>$50.00</p>

<p>GST: 747314888</p>

<ul> <li>this is a public note</li> </ul>

<p>Net</p> <p>$650.00</p>
<p>Subtotal</p> <p>$650.00</p>
<p>GST 5%</p> <p>$32.50</p>
<p>Total</p> <p>$715.00</p>

INSTALLATION BY OTHERS

INSTALLATION BY OTHERS Field notes: Installation, ductwork, patching, all electrical field wiring, start-up & balance, gas or electric shutdown for fire system hook-up fire system hook-up, fire system chemical agent, NO2 cartridge, field piping, detection and pull station line(s), tests and permits.

Note: Customer is responsible for additional labor charges as a result of cooking equipment layout changes after the release of the order, union labor or prevailing wage charges, or additional trips by fire system distributor caused by jobsite delays, permits, fees or test required by local authority. Submittal will specify applicable testing and approval agencies. The fire suppression system final hook up is not included on this quote. The final hook up usually consists of, but is not limited to, the chemical agent, Wet chemical cylinder, field piping/repiping, detection and pull station line(s), tests, and permits.Hook up for the fire system must be performed by an Authorized Distributor. If not installed by an Authorized Distributor, then the warranty on this product will be voided.

Grease Ducks Ltd. requirement for all field hook ups: All fire system detection conduit must be half inch EMT. All conduit fittings must be compression type and fully tightened. All conduit ends must be reamed and deburred and blown clear of debris prior to assembly. All conduit must be fully and robustly supported to avoid accidental fire system discharge.

Ventilation Direct product must be installed in accordance with installation instructions provided with equipment or available on our web site at www.greaseducks.com.

SHIPPING

Freight includes one shipment only, delivered to the job site address listed on this proposal. Customer is responsible for freight charges on any items shipped early. This is an estimated freight charge and is subject to change based on current freight costs when the job is released for production.

APPROVAL

The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to perform the work specified. Receipt of the Grease Ducks Ltd. Terms & Conditions are hereby acknowledged and by signature hereto, we agree to said Terms & Conditions. Payment will be made in accordance with authorized agreement. Please note, proposal may be withdrawn by Grease Ducks Ltd. if not accepted within 30 days.

Grease Ducks Ltd.
Dummy Company

Alex Collins test

2023-08-21
Date
Date
We accept MasterCard®, VISA® cards for immediate credit approval and expedited order processing.